EN CZ

CanSat

Team

We are team of students participating in CanSat competition. Our goal is to make a satellite size of can. We're not alone, we also have two androids in our team - EVA and TOM.

EVA

Parachute

EVA (Environmental Vocation Architecture) is our probe and core part of our mission. She will measure a lot of data during her fall.

TOM

Base and probe

TOM (Technical Operation Machine) is our base station. He is connected to antenna and receives data which are sent by EVA. These data are being show on TOM´s display and also are sent via USB to connected computer.

Progress of our mission

Sign in to competition

19th October 2018

Our team signed in to the CanSat competition.

Video

14th December 2018

We sent video presenting our mission to ESERO.

Detail

openCanSat KIT features

11th January 2019

We are getting to know with the openCanSat KIT.

Detail

3D printing

15th January 2019

We are priting prototype of our base station TOM.

Detail

Aerial

18th January 2019

We received the aerial from our sponsor radio-shop.

Detail

Aerial test

26th January 2019

We successfully tested our aerial.

Detail

Semi-finals

29th January 2019

We won the national CanSat semi-finals.

Detail

Sensors

20th February 2019

We connected almost all sensors to our board.

Detail

Web wireframe

10th March 2019

We finisned the web wireframe.

ENERSOL

21st–22nd March 2019

We presented our project at the national ENERSOL competition.

Detail

Next aerial test

25th March 2019

Another successful aerial test on the further distance.

Construction

12th April 2019

We are finishing the construction models.

Software for EVA and TOM

18th April 2019

Software for EVA and TOM is being finished.

Parachute test

19th April 2019

Both our parachutes were successfully test at Milíř lookout.

Soldering

20th April 2019

Whole circuit was successfully soldered.

Dashboard

20th April 2019

We finished the chart dashboard for data visualisation from our mission.

Final report

21st April 2019

The final report was sent.

Final tests of cunstruction

22nd April 2019

EVA is ready for the mission!

1st place in national finals

25th–26th April 2019

We won the national finals and we will represet the Czech Republic in European finals.

Detail

Visit of T-CZ

14th May 2019

Our hardware engineers visited T-CZ and talked about the aerial.

Prusa Research visit

24th May 2019

We visited of our general sponsors Prusa Research.

Detail

Consultation at FEL

27th May 2019

Our software engineer consulted the data visualisation at DCGI FEL CTU.

Detail

Aerial testing

5th June 2019

We successfully tested our aerial with T-CZ engineer.

Detail

Pre-launch report

9th June 2019

We sent pre-launch report to international jury.

Visit of CHMI

13th June 2019

Václav Pavlíček visited CHMI and learned how to process the meteorological data.

Detail

Sign in to competition

19th October 2018

Our team signed in to the CanSat competition.

Video

14th December 2018

We sent video presenting our mission to ESERO.

Detail

openCanSat KIT features

11th January 2019

We are getting to know with the openCanSat KIT.

Detail

3D printing

15th January 2019

We are priting prototype of our base station TOM.

Detail

Aerial

18th January 2019

We received the aerial from our sponsor radio-shop.

Detail

Aerial test

26th January 2019

We successfully tested our aerial.

Detail

Semi-finals

29th January 2019

We won the national CanSat semi-finals.

Detail

Sensors

20th February 2019

We connected almost all sensors to our board.

Detail

Web wireframe

10th March 2019

We finisned the web wireframe.

ENERSOL

21st–22nd March 2019

We presented our project at the national ENERSOL competition.

Detail

Next aerial test

25th March 2019

Another successful aerial test on the further distance.

Construction

12th April 2019

We are finishing the construction models.

Software for EVA and TOM

18th April 2019

Software for EVA and TOM is being finished.

Parachute test

19th April 2019

Both our parachutes were successfully test at Milíř lookout.

Soldering

20th April 2019

Whole circuit was successfully soldered.

Dashboard

20th April 2019

We finished the chart dashboard for data visualisation from our mission.

Final report

21st April 2019

The final report was sent.

Final tests of cunstruction

22nd April 2019

EVA is ready for the mission!

1st place in national finals

25th–26th April 2019

We won the national finals and we will represet theCzech Republic in European finals.

Detail

Visit of T-CZ

14th May 2019

Our hardware engineers visited T-CZ and talked about the aerial.

Prusa Research visit

24th May 2019

We visited of our general sponsors Prusa Research.

Detail

Consultation at FEL

27th May 2019

Our software engineer consulted the data visualisation at DCGI FEL CTU.

Detail

Aerial testing

5th June 2019

We successfully tested our aerial with T-CZ engineer.

Detail

Pre-launch report

9th June 2019

We sent pre-launch report to international jury.

Visit of CHMI

13th June 2019

Václav Pavlíček visited CHMI and learned how to process the meteorological data.

Detail

Articles

Arduino na projektu CanSat [CZ]

Platforma Arduino má široké možnosti využití. Své uplatnění našla v soutěži CanSat, kterou každoročně organizuje Vzdělávací kancelář Evropské vesmírné agentury ESERO. Se svými zkušenostmi se s námi podělil Václav Pavlíček ze skupiny Charles 4th, která letos vyhrála české kolo soutěže.

Read more

Tým Charles4th na soutěži CanSat 2019 [CZ]

Ve dnech 25. a 26.4. jsme se zúčastnili národního finále soutěže CanSat 2019 v Plzni (letiště Erpužice a Centrum robotiky v Plzni). Soutěž měla dvě části. První probíhala na letišti v Erpužicích, kde probíhal test CanSatu (naší EVY). Druhá v Centru robotiky v Plzni. Přinášíme reportáž z celé akce.

Read more

Národní finále CanSat 2019 zná své vítěze! [CZ]

V plzeňském Centru robotiky a na letišti v Erpužicích se 25. a 26. dubna 2019 utkalo 11 týmů z celé ČR za účelem postoupit do evropského finále soutěže CanSat, které se uskuteční v červnu v italské Bologni. Nejlépe se úkolu zhostili nováčci z týmu Charles the Fourth z Pardubic.

Read more

Národní finále soutěže CanSat [CZ]

Ve dnech 25. a 26.4. jsme se zúčastnili národního finále soutěže CanSat 2019 v Plzni (letiště Erpužice a Centrum robotiky v Plzni).

Read more

Team

Lukáš Valta

Lukáš Valta

Leader, promotion

lukas@charles4th.cz
Václav Pavlíček

Václav Pavlíček

Software

vaclav@charles4th.cz
Daniel Dworschak

Daniel Dworschak

Construction

daniel@charles4th.cz
Tomáš Forejt

Tomáš Forejt

Firmware

tomas@charles4th.cz
Petr Plíva

Petr Plíva

Hardware

petr@charles4th.cz
Marek Dittrich

Marek Dittrich

Hardware

marek@charles4th.cz

Sponsors

Would like to become our sponsor? Feel free to contact us at: info@charles4th.cz.

Contact